Carothers Parkway Extension

Franklin, TN

View Project Images

Owner: 
City of Franklin
109 3rd Avenue South
Franklin, TN 37064

Engineer: 
Wilbur Smith and Associates
6640 Carothers Parkway
Suite 160
Franklin, TN 37067


 

The project included a .636 mile extension of Carothers Parkway between Cool Springs Blvd. and McEwen Drive and rehabilitation of  a 1,200 foot stretch of Cool Springs Boulevard.  This extension of Carothers Parkway provides access to the new Nissan Headquarters as well as various sites owned by Crescent Resources.  The scope of work  included rock blasting, dirt/rock excavation, storm piping, installation of water main and duct bank, electrical, curb and gutter, paving, and installation of a new traffic signal at Nissan Way, the main entrance for the Nissan Headquarters.

Rehabilitation of Cool Springs Boulevard included construction of a new turn-lane at the Carothers Parkway intersection and a night-time milling and resurfacing operation of east-bound Cool Springs Boulevard between the I-65 bridge and Carothers Parkway.

 


 

Stats:  
Total Roadway Length Added .636 Miles
Dirt / Rock Moved or Imported 114,000 CY
Storm Piping Installed 4,500 LF 
Water Lines Installed 4,100 LF 
Sidewalk 23,400 LF 
Curb and Curb and Gutter Placed 9,800 LF
Paving Placed 32,600 SY